Things have been progressing well on site over the last couple of weeks.
There was a minor delay with delivery of the steel beams and floor system components. However, with that now resolved and the Wallform ground floor walls filled with concrete to underside of floor beam level, the first floor has now been successfully installed.
The concrete block infill can be seen nearing completion in the photos below.
Stone cladding on the exterior has commenced in places as well (top image).
With the ground floor shell complete the client is taking a short break before starting the first floor level Wallform.