Under Construction
Construction began in 2014, with the first load of Wallform 438 wallblocks delivered to site ready to begin construction of the first block of 6 homes.
18 Wallform homes in total were built over the course of the following year.



The Edge, Lincolnshire was last modified: October 10th, 2025 by

